| Price on works on the device of parquet coverage |
| name |
amount |
price |
| Piling of piece parquet (fir-tree, deck, sword) |
1m2 |
6,00 |
| Piling of piece parquet from exotic breeds |
1m2 |
7,00 |
| Piling of deck board |
1m2 |
8,00 |
| Piling of deck board from exotic breeds |
1m2 |
9,00 |
| Piling of the lacquered parquet |
1m2 |
12,00 |
| Piling of floors board on lagi |
1m2 |
8,00 |
| Piling of parquet board on foundation |
1m2 |
7,00 |
| Piling of parquet board with gluing on foundation |
1m2 |
8,00 |
| Conclusion of linett |
1m2 |
6,00 |
| Piling of artistic parquet is I sort |
1m2 |
15,00 |
| Piling of artistic parquet is II sort |
1m2 |
20,00 |
| Piling of artistic parquet is sort III (without the modules) |
1m2 |
25,00 |
| Piling of palace parquet |
1m2 |
50,00 |
| Conclusion of parquet frisian |
1m/l |
5,00 |
| The device is lag on a level |
1m/l |
9,00 |
| Piling of draft floor |
1m2 |
6,00 |
Piling of plywood |
1m2 |
2,50 |
| Polishing of plywood |
1m2 |
1,50 |
| Polishing of parquet (Profit, Legler, Flip) |
1m2 |
7,00 |
| Polishing of artistic parquet (Profit, Legler, Flip) |
1m2 |
9,00 |
| Causing of gel for filling of micro-cracks |
1m2 |
2,00 |
| Causing of the lacquered coverage (including the intermediate polishing) |
1m2 |
1,50 |
| Causing of oil (including the intermediate polishing) |
1m2 |
2,00 |
| Additional services |
|
|
| Setting of the cork compensating by a tile and parquet |
1m/l |
15,00 |
| Cutting and editing of plinth throat in the rectangular apartments |
1m/l |
3,00 |
| Cutting and editing of plinth throat in the rectangular apartments with the complicated configuration |
1m/l |
5,00 |
| Cutting and editing of plinth throat along curvilinear walls |
1m/l |
12,00 |
| Cutting of parquet throat to the curvilinear areas |
1m/l |
10,00 |
| Device of hydralock |
1m/l |
2,00 |
| Leveling to 10mm |
1m2 |
3,00 |
| Dismantling of old parquet (without the export of parquet) |
1ì2 |
3,00 |
| Repair of concrete foundation |
|
|
| Transversal sewing together of cracks |
1m/l |
3,00 |
| Reinforcement of cracks by staples |
1m/l |
1,00 |
| Putty of repair stitches by a two-component putty |
1m/l |
3,00 |
| Polishing of local unevennesses of gathering by a machine |
1m2 |
4,00 |
| Causing of evening composition by a thickness no more 10mm |
1m2 |
3,00 |
| Causing of protective tool |
1m2 |
1,50 |
Prices are indicated in a dollar
Term of guarantee of 3 year on all types of parquet works
In the process of piling of parquet chaffs professional chemistry and equipment is used.
|
|
Copyright © 2005 European Parquet, Inc. All rights are reserved
|
|
|